East View High School – Main Gym

East View High School - Main Gym

Share:

City: Georgetown, Texas

Date: Summer 2021

Scope: Sand / Paint / Finish

Sq. Footage: 21,700 sq. ft.

East View high school’s main gym required the removal and replacement of the damaged flooring and subfloor.  After replacing with 2nd grade or better maple, the main and flanking side-courts were painted with game lines and graphics.  Coated the floor with 2 coats of oil-base finish for protection and performance.

Related Projects