East View High School – Main Gym

East View High School - Main Gym

Share:

City: East View High School, Georgetown, Texas | Georgetown ISD

Date: Summer 2021

Scope: Sand / Paint / Finish

Sq. Footage: 21,700 sq. ft.

East View high school’s main gym was devastated by Winter Storm Uri.  The storm caused extensive water damage.  Thus, the gym required the removal and replacement of the damaged flooring and subfloor.  After replacing the courts with 2nd grade or better maple, the main and flanking side-courts were painted with game lines and graphics.  The QHF team then coated the entire floor with two coats of oil-base finish for protection and performance.